Safety Recognition Program
Menu

Full Service Commercial Concrete Subcontractor

Green Valley Hospital

The Green Valley Hospital is a new 49 bed, full service general acute care hospital located on a 21.5 acre campus. The facility includes an emergency department with 2 trauma/major medical rooms, a helicopter pad, a surgical suite with 4 oversized rooms and 2 procedure rooms, preoperative and post anesthesia care units, a cardiac catheterization laboratory, a full service laboratory and blood bank, and an inpatient pharmacy.

Hardrock's scope of work included continuous and spread footings, elevator pits including CIP walls, mat foundation, lintels, CIP columns, CIP walls, shear walls, 12” thick CIP concrete structural deck, drop panels, CIP pedestals, CIP beams, interior slab on grade, equipment pads, and stair pan fill.

View more Medical projects or View all projects
Send bid invitations to: bidinvites@hrconcrete.com
Phoenix Map
PHOENIX OFFICE
4839 W. Brill St.
Phoenix, AZ 85043
(t) 602.233.3334 • (f) 602.233.2777
Tucson Map
TUCSON OFFICE
6360 S. Del Moral Blvd.
Tucson, AZ 85706
(t) 520.807.6265 • (f) 520.807.6271
Albuquerque Map
ALBUQUERQUE OFFICE
One Sun Plaza
100 Sun Avenue N.E. Suite 607
Albuquerque, NM 87109
(t) 505.288.1979
TOLL FREE 800.788.5278
Connect with us!

Arizona • License ROC #096338 C-9 | California • License #925931 C-8

New Mexico • License #362105 GS-04 | Texas • Contractor license not required

Nevada • License #0077870 C-5

Avenue 25 - Phoenix Web & Graphic Design Studio